One power plant in India supplies about a tenth of all the electricity used in Bangladesh. It sits in Godda, a district in the Indian state of Jharkhand. Every megawatt it makes is sent across the border. The plant is owned by Adani Power. Behind it lies one of the most argued-over energy contracts in South Asia.
On paper, the arrangement looks simple. Bangladesh buys power for 25 years. Adani builds and runs the plant. In practice, the story has included unpaid bills, a plant shut down in protest, a government review that called the price far too high, arbitration, and a court order. Yet the electricity keeps flowing. In 2026, the plant is running again at near full strength, and the money fight is still unresolved.
This guide explains the whole story: what the Godda plant is, how the deal was made, why the two sides disagree about the price, and what it means for Bangladesh’s energy supply in 2026.
What is the Adani Godda power plant?
The Adani Godda power station is a coal-fired plant in Motia village, Godda district, Jharkhand, India. It has two units of 800 megawatts each, giving it a total capacity of 1,600 megawatts. Both units use ultra-supercritical technology, a newer coal design that burns fuel more efficiently than older plants. The plant was built for one customer only: Bangladesh.
| Fact | Detail |
|---|---|
| Location | Motia, Godda district, Jharkhand, India |
| Capacity | 1,600 MW (two units of 800 MW) |
| Fuel | Coal, ultra-supercritical technology |
| Contracted supply to Bangladesh | 1,496 MW net capacity |
| Agreement | 25-year power purchase agreement, signed 2017 |
| Supply began | March 2023 (Unit 1); full plant June 2023 |
| Transmission | 130-km, 400 kV cross-border line to Bangladesh |
| Share of Bangladesh power | Roughly 8 to 10 percent of total supply |
The plant is unusual in another way. It was built in India, on Indian soil, to serve a foreign grid. A dedicated 130-kilometre, 400 kV transmission line carries its entire output into Bangladesh. It is one of the largest examples of cross-border electricity trade in South Asia.
How did the Adani Bangladesh power deal happen?
The Adani electricity export deal began with a memorandum of understanding signed on 11 August 2016 between Adani Power and the Bangladesh Power Development Board, known as BPDB. Under the plan, a 2×800 MW thermal plant would be built on a build-own-operate basis in India, exporting all its power to Bangladesh. The Bangladesh power purchase agreement that followed in 2017 runs for 25 years.
At the time, the logic was clear. Bangladesh’s economy was growing fast, and demand for electricity was rising with it. Domestic gas, the country’s main power source, was already in decline. A large, dedicated plant across the border promised steady baseload power, the kind that runs day and night. For Adani, the deal offered a guaranteed buyer for a brand-new plant.
Construction took several years. Unit 1 was officially commissioned in March 2023, and electricity supply to Bangladesh began. By June 2023, the full plant was running. In 2019, the Indian government had designated the plant as part of a special economic zone, giving it tax and duty exemptions. That detail would later become a major point of dispute.
For its first year and a half, the arrangement worked much as planned. Then, in late 2024, the politics around it changed completely.
Why did Adani cut power supply to Bangladesh in 2024?
In August 2024, the government of Sheikh Hasina, a close ally of India, was overthrown in an uprising. The interim government that followed, led by Nobel laureate Muhammad Yunus, began reviewing contracts signed under the previous government. Adani’s deal was near the top of the list.
By early November 2024, Adani Power said Bangladesh owed about $850 million in unpaid bills. On 1 November 2024, the company shut down one unit at Godda, halving the electricity supply to Bangladesh. The plant was reported to be running at about 42 percent of its capacity. Bangladesh opened a line of credit worth $170 million in an effort to avert further cuts.
In turn, Dhaka told the company to supply only half the agreed electricity. The standoff lasted for months. Payments were made in stages. In June 2025, Bangladesh paid $437 million, clearing arrears for electricity supplied until 31 March 2025. According to Reuters, Bangladesh had by then paid $1.2 billion out of about $2 billion billed in total.
Ahead of the summer of 2025, BPDB asked Adani to resume full delivery. The company agreed. By early 2025, Adani’s chief financial officer, Dilip Jha, was telling reporters that the company was “supplying full power to Bangladesh” and that “the payment we are receiving now is more than the monthly billing”. The crisis had eased. But the underlying argument about price had not.
Why does Bangladesh say Adani power is overpriced?
In January 2026, a Bangladesh government panel delivered its verdict. The National Review Committee on Power Purchase Agreements said it had found “egregious anomalies” in the Adani deal. Its report estimated that electricity from Godda costs 39.7 percent more than its nearest private-sector competitor, and roughly 50 percent higher than what it should be. The committee put the overpricing at 4 to 5 cents per kilowatt-hour.
Behind the claim sit some stark numbers. BPDB data showed that Adani-supplied power cost Tk 14.87 per kilowatt-hour in financial year 2024, compared with Tk 8 to 10 per kilowatt-hour from other Indian suppliers. The committee said BPDB had suffered losses of $4.13 billion in 2024-25. It also noted that Bangladesh pays Adani about $1 billion a year under the 25-year contract.
The committee recommended renegotiating “the most fiscally damaging provisions” of the contract. It said contracts should be cancelled where there was direct evidence of corruption, and prices renegotiated with all private parties to market-competitive levels. The report suggested the pattern showed “systematic collusion between businesses, politicians and bureaucrats” to award overpriced contracts.
Adani Power said it had not seen the report. The company has maintained that it supplies “amongst the most competitively priced” power. It has also pointed out that it kept supplying electricity through the political turmoil, when other generators cut back or stopped. “We have continued to honour our supply commitment despite large receivables,” the company said, and urged Dhaka to clear the dues “at the earliest as this is impacting our operations”.
What exactly are the two sides fighting about?
The BPDB Adani dispute is not one argument. It is several, tangled together. The biggest is the price of coal. How much Bangladesh pays for Godda power depends heavily on the coal price written into the contract. BPDB has challenged how that price is calculated, including which coal price index is used. Adani has rejected deductions BPDB applied to its invoices for April, May, June and July 2026, saying they relate to the coal price calculation, the plant’s dependable capacity, and a power-factor adjustment in the variable operation and maintenance calculation.
In letters dated 21 and 26 August 2026, Adani said the outstanding dues under the PPA stood at $711.72 million as of 31 July 2026. BPDB’s own acknowledged figure was $384.81 million, including late payment surcharge up to the same date. The gap between the two numbers is the dispute itself. Adani has formally rejected the deductions and said it reserves all its contractual and legal rights. BPDB’s chairman has said the two sides are negotiating coal pricing to settle the dispute.
A second argument concerns tax benefits. The plant’s special economic zone status gave Adani tax and duty exemptions in India. BPDB asked for those benefits to be reflected in the electricity price for Bangladesh. Adani rejected the request. The company also ended a price discount in May 2025 that had saved Bangladesh an estimated $13 million.
A third argument is about capacity charges. Under the PPA, Bangladesh pays not only for the electricity it uses but also for the plant’s availability. Critics say the capacity charges are excessive. The National Review Committee made this one of its central findings.
How much does Bangladesh owe Adani now?
The honest answer on Adani Bangladesh dues is that it depends on who is counting, and when. For more than a year, the two sides have disagreed about the total. Here is how the figures have moved.
| When | What was reported |
|---|---|
| November 2024 | About $850 million unpaid; Adani halves supply |
| June 2025 | Bangladesh pays $437 million, clearing arrears to 31 March 2025 |
| Early 2025 | Dues down from nearly $2 billion to about $500 million, per Adani |
| December 2025 | Adani source claims $900 million owed; BPDB says about $650 million |
| 31 July 2026 | Adani claims $711.72 million; BPDB acknowledges $384.81 million |
| 30 October 2026 | About Rs 7,500 crore owed, per Adani Power’s latest update |
The most recent update, reported on 30 October 2026, puts the picture like this. Adani Power has billed a total of Rs 16,600 crore to date and received Rs 10,018 crore. About Rs 1,128.8 crore of the outstanding amount is late payment surcharge. The company’s chief executive, S. B. Khyalia, confirmed that supply continues without interruption. He also said current payments are now exceeding monthly billing levels, which is slowly bringing the balance down.
Adani’s chief financial officer has said the company expects to recover the full amount, including late payment surcharge. For Bangladesh, the Adani Bangladesh price is now a political question as much as an economic one. He described the remaining gap as “a two month due which is a regular due”. The company has said it does not expect an adverse outcome on recovery.
Where does the dispute stand legally?
Both sides have moved toward formal legal processes, while still talking. The Adani Bangladesh arbitration is being run through the Singapore International Arbitration Centre, known as SIAC, after Adani Power initiated international arbitration against Bangladesh over the payment dispute. In a regulatory filing in early 2026, the company said SIAC had selected and appointed an expert in the matter of reconciliation differences. Both Adani and BPDB have nominated representatives to interact with the expert.
Bangladesh has also taken legal steps. In November 2025, the country’s High Court ordered Adani not to move ahead with the planned Singapore arbitration until an investigation into the power purchase agreement was complete. Two months later, in January 2026, Bangladesh appointed a British law firm to represent BPDB in the mediation proceedings over coal pricing and tariffs.
Neither side has walked away from the table. BPDB’s chairman has confirmed that negotiations on coal pricing are continuing. The arbitration and the talks are running in parallel, which is common in large energy disputes. A binding decision could still be a long way off.
How much power is Godda actually supplying in 2026?
India Bangladesh power trade has grown sharply in 2026, despite the dispute. Power through the Godda plant Bangladesh link hit record volumes in 2026. The Adani Godda plant capacity is 1,600 MW, and in 2026 it is being used more fully than ever. Despite the dispute, the plant’s output has grown sharply in 2026. Government data from both countries showed that exports from Godda rose nearly 38 percent year-on-year in the October to December quarter, reaching about 2.25 billion kilowatt-hours. That pushed India’s share to a record 15.6 percent of Bangladesh’s power mix, up from 12 percent in 2024.
For the whole of 2025, Adani supplied a record 8.63 billion kilowatt-hours, contributing 8.2 percent of Bangladesh’s total electricity supply. During the first 27 days of January 2026, its share reportedly rose to about 10 percent of the country’s power supply. The plant’s operating performance has improved too. In the third quarter of the financial year, its plant load factor rose to 68 percent, up from 50 percent a year earlier. Revenue from the plant reached Rs 2,210 crore in that quarter, against Rs 2,132 crore in the same period a year before.
There have been interruptions. In August 2026, coal transport problems cut supply. Railway congestion and severe storms and rain disrupted coal deliveries, and the plant was supplying only about 800 to 1,000 MW from mid-August. Adani also cut daytime production to save energy for the evening peak. Then, in September 2026, a mechanical fault took Unit 2 offline. Repairs were completed, and on 13 September 2026 both units were back in operation, supplying 1,046.73 MW to the national grid. The 800 MW unit was reconnected at 12:04 pm, and full supply resumed by 2 pm the same day.
By now the pattern is familiar. It delivers. Something disrupts it. It recovers. The money argument continues in the background. Bangladesh power supply 2026 leans on the plant more than ever.
Why does Bangladesh need Adani power so badly?
Bangladesh’s power system has two problems at once, and together they define the Bangladesh energy crisis: plenty of installed capacity on paper, and not enough fuel to run it. Grid-connected capacity stood at 28,919 MW in May 2026. But gas, the country’s main power source, is in sharp decline. A summer planning report in April 2026 put gas supply to power plants at about 900 million cubic feet a day, against roughly 2,524 million cubic feet needed to run the gas fleet. That limited expected gas-fired output to about 5,200 MW.
Bangladesh electricity demand 2026 keeps rising: BPDB says the country needs 15,520 MW during the daytime peak and 16,920 MW during the evening peak. The board’s chairman has said demand is expected to grow by 6 to 7 percent in 2026. Coal imports surged 35 percent in 2025 to a record 17.34 million metric tons, as Bangladesh tried to run its domestic coal plants harder to cover the gas shortfall.
Bangladesh power imports from India fill a real gap. BPDB lists 1,496 MW from Adani’s Godda plant and 1,160 MW through the Bheramara and Tripura links, plus 40 MW from Nepal. That is total import capacity of 2,696 MW. Of that, Adani alone is more than half. Losing it would widen a daily deficit that already exceeded 2,000 MW during the summer peak, when generation was only about 12,500 MW against projected demand of 15,200 MW in April 2026.
This is why the interim government, despite its criticism of the deal, has kept the contract running. Cutting the supply would mean longer outages across the country, possibly 10 to 12 hours a day in the worst case. The politics of the deal and the physics of the grid point in opposite directions.
Can the Rooppur nuclear plant replace Adani?
Bangladesh’s long-term answer to the Adani question may be nuclear power. The Rooppur Nuclear Power Plant, in Ishwardi, Pabna, is the country’s largest electricity project. It has two VVER-1200 reactors with a combined capacity of 2,400 MW. Russian financial and technical help built it, at an estimated cost of $12.65 billion, and it is expected to run for 60 to 80 years.
Fuel loading began on 28 April 2026, formally starting the plant’s operational phase. But it will not replace Adani quickly. The first unit is expected to add only about 300 MW initially, by August 2026, and it will take 10 to 12 months to reach full capacity. Power from Rooppur is expected to be priced comparably to other low-cost sources, which could help bring average costs down over time. For now, though, Bangladesh still needs Godda’s 1,400-plus MW every day.
Other options are limited in the short term. More LNG imports are possible, but they are expensive and exposed to world prices. Domestic gas output continues to fall. Solar and wind are growing, but from a small base. For 2026 at least, the Adani plant remains hard to replace.
What happens next with the Adani Bangladesh power deal?
Four paths are open, and more than one may be followed at once. The first is renegotiation. That route has the National Review Committee’s backing, and BPDB has said it is negotiating coal pricing with Adani. A revised price formula, or a change to capacity charges, could shrink the bill and end the deductions dispute.
The second is arbitration. Under the SIAC process, an expert has been appointed and both sides have nominated representatives. If the talks fail, an arbitrator’s decision would settle the billing differences, though either side could still challenge it.
The third is the courts. In the courts, the High Court’s pause on arbitration remains in force until the investigation into the agreement is complete. That investigation could itself recommend cancelling the contract if corruption is proven. The interim government has said the deal could be scrapped in that case.
Then there is the simplest path of all: carrying on. Supply is running, payments are being made, and both sides have an interest in keeping the lights on. Adani earns about $1 billion in foreign exchange a year from the plant. Bangladesh gets about a tenth of its power. Neither side gains from a shutdown. Adani power Bangladesh will stay in the news for as long as the bills stay unpaid. The most likely outcome for 2026 is a messy middle: power flowing, bills argued over, and lawyers and negotiators working in parallel.
Frequently asked questions
How much electricity does Adani supply to Bangladesh?
The Godda coal plant has a capacity of 1,600 MW and is contracted to supply 1,496 MW net to Bangladesh. It provides roughly 8 to 10 percent of the country’s total electricity. In 2025 it supplied a record 8.63 billion kilowatt-hours. On a typical day in 2026 it has been supplying more than 1,400 MW.
Why is the Adani power deal controversial?
A Bangladesh government review in January 2026 found the power from Godda costs about 40 to 50 percent more than it should, and recommended renegotiation. Critics point to the coal price formula, capacity charges, and tax benefits that were not passed on to Bangladesh. Adani says its power is competitively priced and notes it kept supplying through political turmoil.
How much does Bangladesh owe Adani Power?
The two sides disagree. Adani claimed $711.72 million was outstanding as of 31 July 2026, while BPDB acknowledged $384.81 million including late payment surcharge. The latest update, reported on 30 October 2026, put the amount owed at about Rs 7,500 crore. Adani has billed Rs 16,600 crore in total and received Rs 10,018 crore.
Will Bangladesh cancel the Adani power deal?
Probably not soon. The interim government has said the contract could be cancelled if corruption is proven, and a court has paused arbitration while the agreement is investigated. But Bangladesh needs the power. Losing Godda would widen daily shortages that already exceed 2,000 MW at peak times. Renegotiation or arbitration is more likely than cancellation.
Sources: Reuters reporting via The Financial Express and bdnews24; Agence France-Presse via The Express Tribune; The Hindu BusinessLine; Bangladesh Sangbad Sangstha (BSS); Global Energy Monitor; The Wire; Institute for Energy Economics and Financial Analysis (IEEFA).